Road and Infrastructure - Industrial Package 3

Client: Ashghal 

Scope: Water treatment and monitoring system

Duration: > 24 Months

Requirements: Water treatment of 35,000 m3/day from micro tunneling TBM effluent and dewatering works

Project Details: UH has been hired to design, implement, operate and treat the pumped water which has been contaminated by high values of TSS, Ph, BOD, COD and magnese