Al Wakrah Phase 2, Package 3

Client: Committee of Legacy

Duration: 1 year

Scope: Dewatering-Over pumping-Water Treatment


Project Details:

for this job, UH implemented a sophisticated dewatering system with pumping capacity up to 1,800m3/hr, the job compromise the design and installation of 15 electrical pumps, a booster station with 4,200 Im of HDPE pipe and water treatment. UH got a certification from the client for its valuable engineering solutions in granting efficient cost effective design to pump the said quantity of water along with professional designed HDPE pipe to the sea, UH also involved in ground water treatment works to make sure that the parameters of the water quality is in line with MME standards.